Author: Jeff Beam, Mondo Products Limited, Canadian Carwash Association (CCA) National Board Member - JeffB@mondo-products.com
Building
- Turn furnace/ building heat down to energy efficient level. Do not turn off in case of freezing!
- Turn off master electrical control for equipment
- Lubricate and lock all door locks.
- If possible turn off main water line to prevent any potential flooding
- Hose down floor and trenches removing any sand build up that could harden while closed.
- If entrance and exit pads are heated consider turning them off or down while closed depending on weather patterns in your region.
Equipment
- Turn off power to air compressor. Drain tank of air and water
- Grease all available bearings on equipment to push any water out preventing potential rust while idle
- Drain water from any arch applications that are normally kept full by check valves
- If using Hydrominders to dilute chemicals turn off water supply and drain mixing tank. If there is a screened pick up or check valve in tank take the time to wipe any debris or residue off screen to prevent clogging of screen or valve.
- Ensure all chemical supplies are sealed tightly to prevent evaporation.
- Post this list in a visible location to aid in startup when re-opening